Lechler Maintenance Services for 5TB

Maintenance by the customer

For maintenance after 300 operating hours

To ensure that your 5TB tank cleaning nozzle works efficiently, we recommend performing maintenance a minimum of every 300 operating hours.  Depending on the operating conditions, corresponding maintenance intervals are recom-mended. For example, under harsh operating conditions, the time in between maintenance intervals should be reduced. Always visually inspect the parts for wear at each maintenance interval. O-rings should be replaced after each time a sealing point is opened.

Assembly tools required for 300 hour package

Operation Manual (pdf, 1.28 MB)

Full service maintenance by Lechler

We also offer a full service maintenance package where you send your unit directly to us and we send it back. The maintenance at Lechler is carried out by our technicians who have been trained for this . The maintenance service offered includes the 5TB Spare Part Package and assembly tools. 

Tank Cleaning Nozzle Return Form

Return Maintenance Form by Lechler (pdf, 221.07 KB)

Contact

Lechler, Inc.Phone (800) 777-2926Fax (630) 377-6657serviceusa(at)lechlerusa.com