To ensure your PressureClean 5TP Series high-pressure jet cleaner operates continuously and efficiently, we recommend performing regular maintenance intervals, depending on the operating conditions. Due to the varying levels of wear and tear on components, we recommend performing a minor maintenance check after 300 operating hours (Maintenance 1) and a major maintenance check (Maintenance 2) after 600 operating hours . Major maintenance (Maintenance 2) also includes the spare parts from Maintenance 1. A visual inspection of the parts for wear must always be carried out at each maintenance interval. Under particularly harsh operating conditions, the time until maintenance is required may be shortened. With our maintenance kit, specially tailored to the PressureClean 5TP Series, we offer you a way to carry out the maintenance yourself and thus save valuable time.
Maintenance Kit 1 - For maintenance after 300 hours of operation
Lechler Original Maintenance Parts
Order Number 5TP.000.1Y.SP.10 with:
Maintenance Kit 2 - For maintenance after 600 hours of operation
Lechler Original Maintenance Parts.
Order number 5TP.000.1Y.SP.20 or 5TP.000.1Y.SP.30 (version with sliding flange):
For maintenance 2, a calibration mandrel is also required:
Lechler assembly tool / special tool, order number 5TP.000.35.ST.00.
Service Division General Industry